Arrk Europe – Warehouse Flooring
PSC Flooring Ltd have worked with Arrk Europe for some time but this particular job involved 1500 square metres of which 800sqm was production areas and 700 square metres warehouse flooring.
The first issue faced was that the existing floors had multiple layers of failed floor paint and all areas needed to be heavily shotblasted to clean and prepare the concrete. This stage of the preparation is both noisy and can be dusty.
Once all repairs were completed then two coats of Resdev Pumatect high build epoxy resin were laid, – the chosen safety red applied to the warehouse areas and the light grey applied to production areas and green to walkway gave clear demarcation. As an additional level of health and safety all fire exits were completed with safety yellow chevrons. Despite all the challenges of working around a busy production line the total installation process took 2 weeks and PSC Flooring Ltd worked very closely with Arrk Europe to complete the work in phases so production could continue.